National Authority
for the Litani River
National Authority for the Litani River

After the damage of the aggression on Lebanon: Danesh Company contributes to repairing the damage to the irrigation project

21 December 2024

After the war launched by the Israeli enemy on Lebanon, which included an airstrike on October 8 targeting the main carrier of the Qasimiyah and Ras al-Ain irrigation canal project in the Arzi area, causing severe damage to the carrier with a length of approximately 65 m, including a 6 m water culvert, and after inspecting and identifying the damage, Danesh Contracting and Trading Company took the initiative to implement the 6 m long culvert, dig and remove the damage to the carrier, and prepare the land with Typhenol for a length of 50 m at its own expense. The Authority will conduct a tender to award the remaining works to rehabilitate the carrier as soon as possible so that the irrigation canal is ready to drain water into it to feed the agricultural lands benefiting from the canal before the start of the 2025 irrigation season.

 

For more photos:

Maintenance and rehabilitation works of the sections damaged by the war in the Qasimiyah - Ras al-Ain irrigation project with the participation of the local community